introduction
The Village of Oak Park, City of Berwyn, and Town of Cicero
have joined together to revitalize a key 1.25-mile segment of
Roosevelt Road between Austin Boulevard and Harlem Avenue. The
multi-jurisdictional effort is expected to result in
development of a streetscape design plan and new zoning
regulations, both of which are intended to improve the
appearance, accessibility and function of the corridor.
The project officially began on April 9, 2008 when the consultant
team conducted an initial tour of the corridor accompanied by
members of the Roosevelt Road Advisory Committee and representatives
from the three municipalities. The consultants are expected to
complete the streetscape design plan in late fall of 2008, with the
new zoning regulations to follow shortly thereafter.
UPCOMING Events
Stay tuned for updates.
Draft Zoning Regulations for Roosevelt Road Corridor:
Oak Park
Berwyn
Cicero
Latest News
Oak Park Plan Commission recommends approval of
zoning regulations
At their September 3, 2009 meeting, the Oak Park Plan
Commission recommended approval of the new Roosevelt Road
zoning regulations by a vote of 7-1. The Oak Park Village
Board is expected to consider adoption of the proposed
regulations in November. Please check back for further
information about the timing of the Village Board meeting.
Terra Engineering/The Lakota Group Selected for
Next Phase of Streetscape Work In late 2008,
following the completion of the Preliminary Streetscape Plan,
Oak Park, Berwyn, and Cicero solicited proposals from
engineering firms for preparing construction documents for the
streetscape work. The team of Terra Engineering and The Lakota
Group was selected for this next phase of work. Terra and
Lakota have begun surveying the corridor, creating base maps,
and coordinating with the Illinois Department of
Transportation (IDOT). Through the months of April and May
2009, the design team will work with the Roosevelt Road
Advisory Committee (RRAC) to finalize the streetscape
designs. The team will have construction documents ready for
submittal to IDOT this summer.
Team meetings with IDOT representatives:
March 3, 2009
Minutes
March 11, 2009
Minutes
|
|
Also track Roosevelt Road happenings on:


Tour of the
corridor, April 9, 2008
Latest Documents:
Color Rendering of Streetscape

click image for full-size (4 mb) jpeg
Draft Zoning Regulations for Roosevelt Road Corridor (April
2009):
Oak Park
Berwyn
Cicero
April 8, 2009 Presentations (to RRAC):
Streetscape
Zoning
Resurfacing schedule
Reconstruction schedule
|